You don't have javascript enabled. Good luck with that.
Pencarian
Ini Pengaturan Lalin Selama Uji Coba Tahap 2 Flyover Tanjung Barat dan Lenteng Agung

Here is Traffic Engineering Applied During Phase 2 Trial on Tanjung Barat and Lenteng Agung Flyovers

Jakarta Transportation Agency (Dishub) conducts traffic control due to implementation of phase 2 open traffic trial on Tanjung Barat and Lenteng Agung Flyovers on April 1-6, 2021.

Phase 2 open traffic trial on Tanjung Barat and Lenteng Agung Flyovers on April 1-6, 2021

Jakarta Dishub Head, Syafrin Liputo conveyed, for phase 2 open traffic trial on Tanjung Barat Flyover, his side applied traffic engineering as follows;

a. Traffic engineering on north-north U-turn

Phase 2 Trial on Tanjung Barat and Lenteng Agung Flyovers will Start Tomorrow

1. North-north sides of flyover are used for road users from Jakarta (Pasar Minggu) to Jakarta (Pasar Minggu) by eliminating railroad crossings.

2. North-north sides of flyover can be used for bicycles and small vehicles with maximum height 3.5 meters, public transport, and emergency cars.

3. Heavy vehicles users (above 3.5 meters) can take U-Turn on Jalan T.B. Simatupang.

b. South-south u-Turn traffic arrangement

1. South-south sides on flyover is used for road users who want to take U-turn from Depok.

2. South-south sides on flyover can be used for bicycles, small vehicles with maximum height 3.5 meters, public transport, and emergency cars.

3. Heavy vehicles users (above 3.5 meters) can take U-Turn on Jalan Pasar Minggu.

c. Traffic flow from Jakarta to Depok (thru-traffic)

1. Small vehicles can go through Jalan Tanjung Barat Raya (frontage road)

2. Medium-sized vehicles can go through Jalan Tanjung Barat Lama, Jalan SPBU Pertamina, then Jalan Tanjung Barat Raya

3. Heavy vehicles can go through Jalan Tanjung Barat Lama and Jalan T.B. Simatupang, then take T.B. Simatupang U-turn, turn right to Jalan Tanjung Barat Raya.

d. Traffic flow from Depok to Jakarta (thru-traffic) can access Jalan Raya Tanjung Barat (frontage road).

"Phase 2 open traffic trial on Tanjung Barat Flyover will be implemented on April 1-6, 2021 at 06:00-22:00," he explained, Thursday (4/1).

Meanwhile, here are traffic regulations applied for phase 2 open traffic on Lenteng Agung Flyover;

a. Traffic engineering on north-north U-turn

1. North-north sides on flyover is used to turn from Jakarta to Jakarta by eliminating railroad crossings.

2. Traffic flow on north-north sides off ramp flyover can only access Jalan Lenteng Agung Raya.

3. North-north sides of flyover can be used for bicycles and small vehicles with maximum height 3.5 meters, public transport, and emergency cars.

4. Heavy vehicles (above 3.5 meters) and road users who want to go to Jalan Joe can turn around on north-north sides at Pancasila University U-Turn.

b. Traffic engineering on north-north U-turn

1. North-north sides on flyover is used to turn from Jakarta to Jakarta by eliminating railroad crossings.

2. Traffic flow on north-north sides off ramp flyover can only access Jalan Lenteng Agung Raya.

3. North-north sides of flyover can be used for bicycles and small vehicles with maximum height 3.5 meters, public transport, and emergency cars.

4. Heavy vehicles (above 3.5 meters) and road users who want to go to Jalan Joe can turn around on north-north sides at Pancasila University U-Turn.

c. Traffic flow from Jakarta to Depok (thru-traffic) via Jalan Raya Lenteng Agung.

d. Traffic flow from Depok to Jakarta (thru-traffic) can access Jalan Joe and Jalan Baru under Lenteng Agung Flyover.

"Phase 2 open traffic is trialed on Lenteng Agung Flyover on April 1-6, 2021. Then, pedestrian bridge (JPO) girder will be installed at 22:00-05:00 for 14 days," he informed.

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1068 personFolmer
  2. Low Emission Zones: Jakarta’s Concrete Step to Curb Air Pollution

    access_time13-04-2026 remove_red_eye921 personAldi Geri Lumban Tobing
  3. Jakpro Promotes Integration Between JIS and KRL Station

    access_time10-04-2026 remove_red_eye847 personAldi Geri Lumban Tobing
  4. Cilandak Health Center Maintains Optimal Services

    access_time10-04-2026 remove_red_eye812 personTiyo Surya Sakti
  5. Palmeriam Market Adopts QRIS Digital Payment System

    access_time08-04-2026 remove_red_eye713 personNurito